Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Nov 01, 2020     Flap & Aileron Alignment - (12 hours)       Category: Wings
Been a busy couple of weeks and over the last 2 weeks have accomplished a few items that I need to post.

This is the area where the alignment of the flaps and ailerons was done for both wings. The leading edges of the these surfaces (and a few rib rivets) were intentionally left open pending this process. I ran a line from the root to the last rib as a reference. Then, I temp mounted the aileron and flap and clamped in the the proper alignment. I then taped the leading edges and rechecked the alignment. A laser was also used for sighting. I noted what rivet holes properly lined up and riveted just those. I constantly rechecked alignment every few rivets with the line to keep any unwanted twist out. With the alignment firmly in place the remaining rivet holes that were slightly off (not many) were reamed and riveted.

Time consuming to say the least.


 